track displacement inspection vehicle
https://www.coiltransfercar.com

track displacement inspection vehicle

Usage:Heavy Duty Material Transportation 
Application:Steel Industry, Factory, Warehouse, Port 
Brand:Perfect 
Load Capacity:1-300 Ton
Special Function:Anti-Explosion, Heat-Resistant, Lifting 
Control Mode:Pendant/Remote/PLC Control 
Power Mode:Battery/cable powered/rail powered…. 
Color:Customzied 
Trademark:PERFECT 
Transport Package:The Whole Cart Will Be Packed by Tarp. 
Specification:Customized 

Share:
Previous:
Content

track displacement inspection vehicle
Track displacement detection vehicle
Name: Rail Service Car
Load: 1 ton
Power supply mode: lithium battery power supply
Table Size: 1600*1520*1150
Beijing**** Automation System Equipment Co., Ltd. is a high-tech enterprise integrating scientific research, development, production, operation and technical service, mainly engaged in electrical inspection equipment, electrified telecontrol system, power dispatching automation system, substation integrated automation system, video safety monitoring system, stray current integrated monitoring system, integrated information management and office automation system, building intelligent automation products, Design of network engineering and sales of related products, system integration, development and research, development, sales and consulting of software such as electrical engineering and construction management of urban subway and light rail projects, as well as comprehensive technical services, electronic products and communication equipment, development, sales, information and consulting services of computer software, etc.
Beijing****** Automation System Equipment Co., Ltd. purchased a rail overhaul Vehicle on May 23, 2021. After communication with other technicians, it successfully ordered 1 ton rail overhaul vehicle. This rail overhaul vehicle is a normal vehicle body, mainly used for rail flaw detection. It has a high utilization rate and is powered by lithium batteries with a battery supply running time of more than 3 hours. And the traveling recorder is installed on the rail inspection vehicle to save the data.

Inquiry
* Name:
* Email:
Country:
Tel/Whatsapp:
* Message:
More